Mt. SAC Wildlife Sanctuary

Details

Architect RKA Consulting Group
Completion Date April, 2016
Client Mt. San Antonio Community College District
Location Walnut, CA

Overview

The project consisted of replacing a damaged storm drain line with an exposed 200 ft long, 30 ft wide, 12 ft deep storm drain channel. The new storm drain channel was constructed of rock gabions (rocks stacked in wire cages). The project also included construction of a 50 ft long prefabricated bridge over the channel, DG paths, existing earthen slope repairs, and fencing.

Join our growing team
of industry experts

Careers